Six things, and none of them should require asking anyone.

Which stage every live project is at. What's outstanding on each one. What's sitting with a client or a consultant rather than with you. How much of each fee has been invoiced against the work actually done. Who is on what this week. And which projects haven't moved in a fortnight.

That's the list. Nothing on it is exotic and none of it is a report.

Every one of those six is a fact your firm already owns. Somebody in the studio knows each of them right now. The question is only whether the firm knows them, in a place a principal can look, or whether they exist in four heads and three systems and have to be assembled on request.

Ten seconds sounds like a convenience standard. It isn't, and this is the part worth being precise about.

A question that takes an afternoon to answer stops getting asked. Not consciously. You're on a call, a client wants to know whether you can start in February, and finding out how the current work is really tracking would mean two conversations and a wait. So you answer from instinct, which is well-informed and usually right. Multiply that across a month and the firm is being steered by the subset of information that happened to be cheap to get.

Drop the cost of a question to near zero and you don't get the same decisions slightly better informed. You get different questions asked at all.

So the six aren't a dashboard wish list. They're the questions that change what a principal does in a week.

Stage and outstanding items together tell you whether a project is actually moving, which is a different question from whether anyone is busy on it. What's sitting with a client or a consultant tells you which delays aren't yours to solve, and that matters because the response to those is a phone call rather than a resource decision. Fee invoiced against work done tells you whether delivery and billing have drifted apart, which they do quietly on long commercial jobs. Who is on what tells you whether the next commitment you make is possible before you make it.

The sixth is the one almost no firm has. Which projects haven't moved in a fortnight. Everything else on the list describes activity, and activity announces itself. A project that has gone still produces nothing at all, so it only surfaces when something downstream breaks.

What's worth noticing is what isn't on the list.

Whether a project is going well isn't on it. Whether the client is happy isn't on it. Neither of those is checkable in ten seconds and neither ever will be, because they're judgments rather than facts, and a judgment has to be formed by somebody who knows the situation. That's a conversation, and it should stay one.

The list is deliberately all facts. That's what makes ten seconds a reasonable standard rather than an unreasonable one. You're not asking anybody to compress their expertise into a number. You're asking that the plain things be plainly available, so the conversations can be about the hard parts.

Which is also why weekly reporting doesn't satisfy this, even when it's done well. A report is a snapshot somebody prepared, so it's as old as the preparation and it reflects what the preparer thought mattered. By the time it reaches you it's a description of last week, filtered. Useful, and a different instrument from the one this list describes.

None of this is about a firm being disorganised. A practice of eleven projects and thirty-five people got there by running well, and most of it is already recorded somewhere, in systems that were each a sensible choice. The gap is that eleven projects is more than a method built on asking can carry, and asking was never the weak part when there were four.

There's a straightforward way to see where your firm sits. Take the six and time yourself on each one, using a real project, without asking a colleague. Some will come back instantly. One or two will take ten minutes, and one will turn out to be unanswerable without a conversation. The split is the useful part, and it's specific to your firm rather than general.

Projectsmate holds those six against the projects themselves, in one place, so checking them is reading rather than assembling.

A firm running eleven projects should be able to answer all six without interrupting anybody. Most of the industry's software was built for the drawing rather than for that, which is why it still feels like a lot to ask.