At ten people, one person in the firm talks about money. At thirty-five, nobody decided how many do.

It comes up like this. A project lead is in a meeting about the fit-out, the client's project manager asks roughly what the extra floor of coordination would add, and she gives a sensible answer based on what the last one of those cost.

She's right, and she has just priced something.

Nothing about that was a mistake, and it's worth being clear why before going further. The alternative was to say she'd need to check with the principal, in front of a developer's project manager, about a figure she knows the shape of perfectly well. That answer costs the firm credibility in the room, and credibility in the room is part of what a senior project lead is for. Answering was the better of the two moves available to her.

What also happened is that a number entered the client's expectations without passing through anybody's pricing.

It's now an anchor. When the proposal arrives three weeks later at a figure above it, that reads as an increase, and increases need explaining. The conversation that follows isn't about what the work costs. It's about why the number went up, which is a worse conversation to be having and one nobody chose.

Underneath this is something simple that most growing firms haven't looked at directly. You delegated project delivery deliberately. You thought about who runs what, who the client speaks to, who signs a drawing. Pricing got delegated as well, just not on purpose, because at ten people there was no reason to think about it. One person did the fees, and that was the system.

There are two obvious ways to handle it, and both fail in ways you can see coming.

Route the money through the principal and nothing can be answered in a meeting. The project lead becomes a conduit, the client learns that decisions happen elsewhere, and the firm is slower in exactly the conversations where speed reads as competence. It also makes the principal a bottleneck in client meetings, which is the thing a bigger firm was meant to solve.

Let everyone answer and the firm quotes a range it never agreed to. Different leads give different numbers for similar work, nobody records what was said, and the first time anyone finds out is when a client quotes a figure back that nobody can place.

So the useful question isn't who in the firm is allowed to talk about money. It's what they're allowed to say without checking.

There's a real difference between offering a range and making a commitment. A range is information and a commitment is a decision, and plenty of firms treat both as the same act requiring the same person. A project lead who can say that work of this kind has run between two figures on recent projects has answered well, kept the firm's credibility, and committed to nothing.

What makes that safe is having the firm's actual numbers behind it rather than one person's memory of the last job they happened to run. A lead working from her own sample of one will be confident and occasionally a long way off, and neither she nor anybody else will know which it was until the proposal goes out.

And then there's the second half, which is that what gets said in the room usually isn't recorded anywhere. The figure mentioned in a meeting and the figure in the proposal never meet each other. Nobody compares them, because the first one only exists in two people's recollection, and it surfaces months later as a client saying but you told us.

There's a way to see where your firm currently stands on this, and it takes one conversation each. Ask two or three of your project leads what they'd say if a client asked that question tomorrow. Not to correct the answer. To find out what range the firm is quoting at the moment without having agreed to it. Most principals find the answers reasonable and further apart than they expected.

Projectsmate keeps the agreed fee and the variations against each project, so somebody preparing to answer that question has the firm's own record to work from rather than whichever job they remember best.

You delegated delivery on purpose. Pricing went with it, and nobody wrote that down.